Catalog item

PUMP,COOLING SYSTEM,ENGINE

2930FSC
00NCB code
001-6299Item number
NIIN 00-001-6299
Request a quote
DEMIL code
A

Identification

Item name code
35988
PINC
0035988
Criticality code
X
II
0
DEMIL code
A
DEMIL integrity code
1
NIIN assigned
24-SEP-72
Precious metals indicator
U
Hazardous material indicator
N
Schedule B export code
8413309000

Part numbers

Part number
8364236
CAGE
9L007
PEAKER SERVICES INC
CAGE status
A
RNCC
3
RNVC
2
Document availability code
5
RNAAC
HD

Characteristics

SPECIAL FEATURESAPPL R BANK ENGINE
ENGINE MODEL NUMBER FOR WHICH DESIGNED645
END ITEM IDENTIFICATION16 AND 20-645E4,E4B,E5,E7,E7B,E7C DIESEL ENGINE,RH ROTATION.
USAGE DESIGNINDUSTRIAL AND MARINE
MEDIA FOR WHICH DESIGNEDWATER, FRESH
FURNISHED ITEMS AND QUANTITYGASKET 2 AND GEAR 1
ENGINE DESIGN CONTROL ACTIVITY72915

Freight

ACTY CD
AX
NMFC
127600
NMFC sub
X
Uniform freight class
64730
Less than truckload
M
Water commodity code
594
Type of cargo code
Z
Special handling code
9
Air dimension code
A
Air commodity code
VZ
NMF description
PUMPS CIRC/FUEL I/C ENG

Packaging

Unit and preservation

PICA SICA
P
PKG cat
ZZZ0
Unpackaged weight
0.0000
Unpackaged width
0.000
Unpackaged length
0.000
Unpackaged height
0.000
TOS
B
Intermediate container qty
000
No intermediate container quantity specified (000)
Method of preservation
ZZ
Special requirements apply that are not represented by the code symbols; details are provided with the acquisition...
Clng drying
1
Any suitable process that is not injurious to the item.
Pres mat
00
No requirement
Wrap mat
ZZ
Special requirements – see specific instructions or drawings provided
Cush dun
ZZ
Special requirements.
THK
Z
Special requirements – See specific instructions or drawings provided
Unit cont
ZZ
Special requirement – See specific instructions or drawings provided.
PKG data source
A

Unit pack

PICA SICA
P
SPC MKG
00
No special marking
Inter cont
00
No requirement.
UCL
O
Unit container is not an acceptable shipping container.
Lvl A
E
Packing shall be accomplished to meet the performance test requirements of ASTM D4169, Distribution Cycle 18,...
Lvl b
Q
Packing shall be accomplished in accordance with table C-II for the packing level specified.
Lvl c
Q
Unit pack weight
0.0000
UP SZ MAXB
0.00000
UP SZ MAXL
0.00000
UP SZ MAXH
0.00000
Unit pack cube
0.0000
OPI
A
Packaging is in accordance with a procedural specification or an SPI.
Supplemental instructions
ZZ = PACKAGE PER MIL-P-16789 REQUIREMENTS

Packaging instructions

PICA SICA
P
SPI date
00000

Full packaging code breakdown

Related items

Standardization

Item standardization code
5
Orig stdzn dec
98
Dt stdzn dec
01-FEB-1975
NIIN status code
0

Request a quote

Your request goes to A-DEFENSE, a US Defense supplier in Texas, who will reply by email.