Catalog item

PUMP UNIT,CENTRIFUGAL

4320FSC
00NCB code
720-0830Item number
NIIN 00-720-0830
Request a quote
DEMIL code
A

Identification

Item name code
17988
PINC
0017988
Criticality code
X
II
M
DEMIL code
A
NIIN assigned
01-JAN-63
Precious metals indicator
A
ADP equipment code
0
Hazardous material indicator
N
Schedule B export code
8413919520
IUID indicator
Y

Part numbers

Part numberCAGECAGE statusRNCCRNVCDocument availability codeRNAACRNFCRNSCSADC
LSD32S5100-153191080064
NAVAL SHIP SYSTEMS COMMAND
A525XX3D
RW11031793232
CURTISS-WRIGHT ELECTRO-MECHANICAL CORPORATION DBA CURTISS WRIGHT ENGINEERED PUMP DIVISION USE CAGE CODE 0UBG9 FOR CATALOGING
R395XX3D
RW1103170UBG9
CURTISS-WRIGHT ELECTRO-MECHANICAL CORPORATION DIV EPD
AC15ZZ3D9F

Characteristics

PRIME MOVER QUANTITY1
STAGE QUANTITY1
MAXIMUM DISCHARGE FLOW RATEGALLONS PER MINUTE 25.0
OPERATING PRESSUREPOWER DRIVE POUNDS PER SQUARE INCH GAUGE (PSIG) NOMINAL 45.0
MEDIA FOR WHICH DESIGNEDLOCATION NOT OTHERWISE SPECIFIED FUEL/OIL, HYDROCARBON
CENTRIFUGAL PUMP IMPELLER SUCTION TYPESINGLE
DISCHARGE CONNECTION QUANTITY1
DISCHARGE CONNECTION TYPEROUND FLANGE
PUMP QUANTITY1
CENTRIFUGAL PUMP IMPELLER QUANTITY1
INTAKE CONNECTION QUANTITY1
TOTAL HEADFEET 96.600
SUCTION LIFTFEET 23.700
OPERATING SPEED AT RATED CAPACITYREVOLUTIONS PER MINUTE 3500.0
CENTRIFUGAL PUMP DESIGNRADIAL FLOW
INTAKE CONNECTION TYPEROUND FLANGE
PRIME MOVER TYPEWATER TURBINE

MOE rules

MOE rule
YA01
MOE CD
YA
Date assigned
01-DEC-01
PICA
YA
PICA LOA
81
Auth collab
YA

Freight

ACTY CD
XX
NMFC
128000
NMFC sub
X
Uniform freight class
64870
Less than truckload
M
Less than carload
M
Water commodity code
594
Type of cargo code
Z
Special handling code
9
Air dimension code
A
Air commodity code
VZ
NMF description
PUMPS PWR NOI/WORKING HEADS/PARTS

Packaging

Unit and preservation

PICA SICA
P
PKG cat
ZZZZ
Unpackaged weight
0.0000
Unpackaged width
0.000
Unpackaged length
0.000
Unpackaged height
0.000
TOS
Y
Method of preservation
ZZ
Special requirements apply that are not represented by the code symbols; details are provided with the acquisition...
Clng drying
Z
Special requirements - See specific instructions or drawings provided.
Pres mat
ZZ
Special requirement – See specific instructions or drawings provided
Wrap mat
ZZ
Special requirements – see specific instructions or drawings provided
Cush dun
ZZ
Special requirements.
THK
Z
Special requirements – See specific instructions or drawings provided
Unit cont
ZZ
Special requirement – See specific instructions or drawings provided.
PKG data source
A

Unit pack

PICA SICA
P
SPC MKG
99
Inter cont
ZZ
Special requirement – See specific instructions or drawings provided.
UCL
O
Unit container is not an acceptable shipping container.
Lvl A
E
Packing shall be accomplished to meet the performance test requirements of ASTM D4169, Distribution Cycle 18,...
Lvl b
Q
Packing shall be accomplished in accordance with table C-II for the packing level specified.
Lvl c
Q
Unit pack weight
0.0000
UP SZ MAXB
0.00000
UP SZ MAXL
0.00000
UP SZ MAXH
0.00000
Unit pack cube
0.0000
OPI
M
All packaging data is mandatory for compliance and no substitutions are permitted.
Supplemental instructions
ZZ = MIL-P-16789

Packaging instructions

PICA SICA
P
SPI date
00000

Full packaging code breakdown

Related items

Standardization

Item standardization code
2
Orig stdzn dec
AX
Dt stdzn dec
11-MAR-1972
NIIN status code
0

Request a quote

Your request goes to A-DEFENSE, a US Defense supplier in Texas, who will reply by email.