Catalog item

PUMP,ROTARY

4320FSC
01NCB code
314-0240Item number
NIIN 01-314-0240
Request a quote
DEMIL code
A

Identification

Item name code
30410
PINC
0030410
Criticality code
X
II
M
DEMIL code
A
NIIN assigned
22-JAN-90
Precious metals indicator
A
ADP equipment code
0
Hazardous material indicator
N
Schedule B export code
8413600090
IUID indicator
Y

Part numbers

Part number
E-4454 PC48
CAGE
07524
DOVER PUMPS & PROCESS SOLUTIONS SEGMENT INC DBA BLACKMER DIV BLACKMER
CAGE status
A
RNCC
3
RNVC
2
Document availability code
5
RNAAC
HD

Characteristics

END ITEM IDENTIFICATIONCOMPRESSORS AND VACUUM PUMPS
MAXIMUM DISCHARGE FLOW RATEGALLONS PER MINUTE 10.0
DISCHARGE PRESSUREPOUNDS PER SQUARE INCH GAUGE (PSIG) 70.0
OPERATING SPEED AT RATED CAPACITYREVOLUTIONS PER MINUTE 350.0
PUMP ROTATION DIRECTIONCOUNTERCLOCKWISE
VOLUME CONTROL TYPEROTARY
ROTARY PUMP DESIGNVANE

Freight

ACTY CD
HD
NMFC
128000
NMFC sub
X
Uniform freight class
64870
Less than truckload
M
Less than carload
M
Water commodity code
594
Type of cargo code
Z
Special handling code
9
Air dimension code
A
Air commodity code
VZ
NMF description
PUMPS PWR NOI/WORKING HEADS/PARTS

Packaging

Unit and preservation

PICA SICA
P
PKG cat
ZZZ0
Unpackaged weight
0.0000
Unpackaged width
0.000
Unpackaged length
0.000
Unpackaged height
0.000
TOS
B
Intermediate container qty
000
No intermediate container quantity specified (000)
Method of preservation
ZZ
Special requirements apply that are not represented by the code symbols; details are provided with the acquisition...
Clng drying
1
Any suitable process that is not injurious to the item.
Pres mat
00
No requirement
Wrap mat
ZZ
Special requirements – see specific instructions or drawings provided
Cush dun
ZZ
Special requirements.
THK
Z
Special requirements – See specific instructions or drawings provided
Unit cont
ZZ
Special requirement – See specific instructions or drawings provided.
PKG data source
A

Unit pack

PICA SICA
P
SPC MKG
00
No special marking
Inter cont
00
No requirement.
UCL
O
Unit container is not an acceptable shipping container.
Lvl A
E
Packing shall be accomplished to meet the performance test requirements of ASTM D4169, Distribution Cycle 18,...
Lvl b
Q
Packing shall be accomplished in accordance with table C-II for the packing level specified.
Lvl c
Q
Unit pack weight
0.0000
UP SZ MAXB
0.00000
UP SZ MAXL
0.00000
UP SZ MAXH
0.00000
Unit pack cube
0.0000
OPI
A
Packaging is in accordance with a procedural specification or an SPI.
Supplemental instructions
ZZ = PACKAGE PER MIL-P-16789 REQUIREMENTS

Packaging instructions

PICA SICA
P
SPI date
00000

Full packaging code breakdown

Related items

Standardization

Item standardization code
5
Orig stdzn dec
97
Dt stdzn dec
22-JAN-1990
NIIN status code
0

Request a quote

Your request goes to A-DEFENSE, a US Defense supplier in Texas, who will reply by email.