Catalog item
Request a quoteMOTOR-PUMP SUBASSEMBLY,HYDRAULIC
4320FSC
01NCB code
518-4918Item number
NIIN 01-518-4918
- Unit price
- $1,722.06
- Unit of issue
- EA
- Source of supply
- SMS
- DEMIL code
- A
Identification
- Item name code
- 40806
- PINC
- 0040806
- Criticality code
- X
- II
- 0
- DEMIL code
- A
- DEMIL integrity code
- 1
- NIIN assigned
- 15-MAR-04
- Precious metals indicator
- A
- ADP equipment code
- 0
- Hazardous material indicator
- N
- Schedule B export code
- 8413919050
- FedMall
- Y
Management
| Effective date | Major organizational entity | Acquisition advice code | Source of supply | Unit of issue | Unit of measure quantity | Unit price | Quantity per unit pack | Controlled inventory item code | Shelf-life code | Management control | Net price | USC |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01-OCT-2026 | DN | J | SMS | EA | 0.0000 | $1,722.06 | 1 | U | 0 | 9B----- | $0.00 | N |
| 01-OCT-2026 | DS | J | SMS | EA | 0.0000 | $1,722.06 | 1 | U | 0 | ------- | $0.00 | I |
Part numbers
| Part number | CAGE | CAGE status | RNCC | RNVC | Document availability code | RNAAC | RNSC |
|---|---|---|---|---|---|---|---|
| KVEBB1402+KIT | 5H956 PAQUIN COMPANY, THE | A | 5 | 2 | 5 | ZZ | |
| KVEBB1402+KIT | C1787 DANFOSS POWER SOLUTIONS GMBH & CO. OHG | A | 5 | 2 | 5 | ZZ | |
| KVEBB1402+KIT | R1518 DANFOSS POWER SOLUTIONS | A | 5 | 2 | 5 | ZZ | |
| KVEB-B-14-02 | 14120 SAUER-SUNDSTRAND HYDRO-TRANSMISSION DIV | H | 5 | 9 | 6 | ZZ | B |
| KVEBB1402+KIT | 14120 SAUER-SUNDSTRAND HYDRO-TRANSMISSION DIV | H | 3 | 9 | 5 | ZZ |
Characteristics
| END ITEM IDENTIFICATION | USS FRANK CABLE |
|---|---|
| PART NAME ASSIGNED BY CONTROLLING AGENCY | KVEB ELECTRICAL DISPLACEMENT CONTROL FOR SERIES 90-PV |
| SPECIAL FEATURES | BASE DEVICE: ELECTRICAL DISPLACEMENT CONTROL FOR SERIES 90-PV PUMPS. ITEM IS A TWO STAGE ELECTROHYDRAULIC PUMP STROKE CONTROL WHICH USES MECHANICAL FEEDBACK TO ESTABLISH CLOSED LOOP CONTROL OF THESWASHPLATE ANGLE OF SAURER-DA NFOSS SERIES 90 PUMPS. THE FIRST STAGE, THE MCV116 PRESSURE CONTROL PILOT (PCP) IS A TORQUE-MOTOR ACTUATED, DOUBLE-NOZZEL FLAPPER VALVE THAT PRODUCES A DIFFERENTIAL OUTPUT PRESSURE PROPORTIONAL TO THE APPLIED ELECTRICAL SIGNAL. THE SECOND STAGE USES THE DIFFERENTIAL PRESSURE TO DRIVE ITS UNIQUE SPOOL ARRANGEMENT AND PORT OIL TO THE PUMP SERVO CYLINDERS. THE SECOND STAGE SPOOL CONFIGURATION A NULL DEADBAND (FOR MACHINE SAFETY) IN THE PUMP'S OUTPUT WHILEMAINT AINING OPTIMUM DYNAMIC RESPONSE TO CONTROL COMMANDS. THE CONFIGURATION IS 14-85 (DUEL COIL) CURRENT RANGE (MA). PUMP SIZE: 130 CC PUMP S/N 92-19. PILOT STYLE: MS CONNECTOR (14-85 MA). |
MOE rules
- MOE rule
- N9BC
- MOE CD
- DN
- AMC
- 3
- AMSC
- D
- Date assigned
- 01-APR-05
- IMC
- Z
- IMCA
- HD
- PICA
- GX
- PICA LOA
- 01
- SICA
- GH
- SICA LOA
- 5D
- Auth collab
- GX
- Supp collab
- GT HD
- Fmr MOE rl
- N9CD
Service data
Navy
- COG
- 9B
Freight
- ACTY CD
- AX
- NMFC
- 128000
- NMFC sub
- X
- Uniform freight class
- 64870
- Less than truckload
- M
- Water commodity code
- 594
- Type of cargo code
- Z
- Special handling code
- 9
- Air dimension code
- A
- Air commodity code
- VZ
- NMF description
- PUMPS PWR NOI/WORKING HEADS/PARTS
Packaging
Unit and preservation
- PICA SICA
- P
- Unpackaged weight
- 0.0000
- Unpackaged width
- 0.000
- Unpackaged length
- 0.000
- Unpackaged height
- 0.000
- TOS
- B
- Intermediate container qty
- 000No intermediate container quantity specified (000)
- Method of preservation
- BLPlug or seal all openings and preserve using Method 20.
- Clng drying
- 1Any suitable process that is not injurious to the item.
- Pres mat
- 49Vendor's protective grease or oil coating
- Wrap mat
- ZZSpecial requirements – see specific instructions or drawings provided
- Cush dun
- ADCushion, anchor, block or brace as required.
- THK
- C3/4 inch thick
- Unit cont
- E5ASTM D5118/D5118M, fiberboard box.
- PKG data source
- P
Unit pack
- PICA SICA
- P
- SPC MKG
- 00No special marking
- Inter cont
- 00No requirement.
- Lvl A
- QPacking shall be accomplished in accordance with table C.II for the packing level specified.
- Lvl b
- QPacking shall be accomplished in accordance with table C-II for the packing level specified.
- Unit pack weight
- 0.0000
- UP SZ MAXB
- 0.00000
- UP SZ MAXL
- 0.00000
- UP SZ MAXH
- 0.00000
- Unit pack cube
- 0.0000
- OPI
- OOptions can be exercised as to specific method of preservation or DoD approved packaging materials to be used.
Packaging instructions
- PICA SICA
- P
- SPI date
- 00000
Related items
Standardization
- Item standardization code
- 5
- Orig stdzn dec
- 97
- Dt stdzn dec
- 15-MAR-2004
- NIIN status code
- 0
Request a quote
Your request goes to A-DEFENSE, a US Defense supplier in Texas, who will reply by email.