Catalog item
Request a quoteMOTOR,ALTERNATING CURRENT
6105FSC
00NCB code
972-6331Item number
NIIN 00-972-6331
- Unit price
- $658.97
- Unit of issue
- EA
- Source of supply
- SMS
- DEMIL code
- A
Identification
- Item name code
- 00530
- PINC
- 0000530
- Criticality code
- X
- II
- M
- DEMIL code
- A
- DEMIL integrity code
- 1
- NIIN assigned
- 01-JAN-62
- Precious metals indicator
- A
- Hazardous material indicator
- N
- Schedule B export code
- 8501402040
Management
| Effective date | Major organizational entity | Acquisition advice code | Source of supply | Unit of issue | Unit of measure quantity | Unit price | Quantity per unit pack | Controlled inventory item code | Shelf-life code | Recoverability code | Management control | Net price | USC |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01-OCT-2026 | DA | J | SMS | EA | 0.0000 | $658.97 | 1 | U | 0 | F | J2100X- | $0.00 | A |
| 01-OCT-2026 | DF | J | SMS | EA | 0.0000 | $658.97 | 1 | U | 0 | P | SF9SX-N | $0.00 | F |
| 01-OCT-2026 | DN | J | SMS | EA | 0.0000 | $658.97 | 1 | U | 0 | 9B----- | $0.00 | N | |
| 01-OCT-2026 | DS | J | SMS | EA | 0.0000 | $658.97 | 1 | U | 0 | F | ------- | $0.00 | I |
| 01-OCT-2026 | GP | J | SMS | EA | 0.0000 | $658.97 | 1 | U | 0 | ------- | $0.00 | C |
Part numbers
Characteristics
| MOUNTING METHOD | FIXED BASE |
|---|---|
| HOLE DEPTH | SINGLE END INCHES NOMINAL 0.3750 |
| SHAFT DIAMETER | SINGLE END INCHES NOMINAL 0.3750 |
| COOLING METHOD | FAN COOLED |
| CURRENT RATING METHOD | LOAD |
| INCLOSURE SPECIFICATION | COMMERCIAL |
| FEATURES PROVIDED | THERMAL PROTECTIVE DEVICE AND HORIZONTAL MOUNTING POSITION AND VERTICAL MOUNTING POSITION |
| POWER RATING | OUTPUT HORSEPOWER 0.0500 |
| LENGTH OF SHAFT FROM HOUSING | SINGLE END INCHES 3.844 |
| SHAFT CENTER TO MOUNTING SURFACE DISTANCE | SINGLE END INCHES 3.500 |
| NOMINAL CENTER TO CENTER DISTANCE BETWEEN MOUNTING FACILITIES PARALLEL TO LENGTH | INCHES 5.750 |
| TEMP RATING | OPERATING CELSIUS 40.0 |
| ROTOR SPEED RATING IN RPM | SINGLE FULL LOAD 3600.0 |
| NOMINAL CENTER TO CENTER DISTANCE BETWEEN MOUNTING FACILITIES PARALLEL TO WIDTH | INCHES 2.812 |
| CURRENT RATING IN AMPS | INPUT SINGLE 1.250 |
| CONNECTION TYPE AND VOLTAGE RATING IN VOLTS | INPUT LINE TO NEUTRAL SINGLE 115.0 |
| SHAFT END CHARACTERISTIC | SINGLE END SINGLE STYLE A13 |
| PHASE | INPUT SINGLE |
| FREQUENCY IN HERTZ | 60.0 |
| TERMINAL TYPE AND QUANTITY | SOLDERLESS LUG 2 |
| HOLE CENTER TO SHAFT END DISTANCE | SINGLE END INCHES NOMINAL 0.5620 |
| SHAFT ROTATION DIRECTION | SINGLE END CLOCKWISE |
| DUTY CYCLE | CONTINUOUS |
| SPECIFIC USE | SYSTEM NO. 474L,BALLISTIC MISSILE EARLY WARNING |
| WINDING TYPE | SYNCHRONOUS |
| ENCLOSURE FEATURE | OPEN PROTECTED |
| OVERALL HEIGHT | INCHES 7.688 |
| OVERALL LENGTH | INCHES 8.125 |
| HOLE DIAMETER | SINGLE END INCHES NOMINAL 0.1380 |
| MOUNTING FACILITY TYPE AND QUANTITY | THREADED HOLE(S) 4 |
| OVERALL WIDTH | INCHES 3.375 |
MOE rules
| MOE rule | MOE CD | AMC | AMSC | Date assigned | IMC | IMCA | Acquisition advice code | PICA | PICA LOA | SICA | SICA LOA | Auth collab | Supp collab | Fmr MOE rl |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| WP01 | WP | 01-MAR-06 | WP | 81 | WP | |||||||||
| YB01 | YB | 01-APR-91 | YB | 81 | YB | |||||||||
| ZC01 | ZC | 01-APR-91 | ZC | 81 | ZC | |||||||||
| ZF01 | ZF | 01-OCT-96 | ZF | 81 | ZF | |||||||||
| ZH01 | ZH | 01-APR-91 | ZH | 81 | ZH | |||||||||
| ZJ01 | ZJ | 01-APR-25 | ZJ | 81 | ZJ | |||||||||
| ZR01 | ZR | 01-JUL-97 | ZR | 81 | ZR | |||||||||
| ZU01 | ZU | 01-APR-91 | ZU | 81 | ZU | |||||||||
| ZW01 | ZW | 01-NOV-98 | ZW | 81 | ZW | |||||||||
| C911 | GP | 3 | C | 01-SEP-06 | GX | 01 | XG | 5D | XG GX | C006 | ||||
| A920 | DA | 3 | C | 01-SEP-06 | Z | CL | GX | 01 | CD | 5D | GX CD | A183 | ||
| FXGG | DF | 3 | C | 01-SEP-06 | Z | SX | GX | 01 | SX | 5D | GX TU | FXCX | ||
| G280 | T1 | 0 | 0 | 01-APR-91 | C | 28 | 48 | 28 75 | ||||||
| N9BG | DN | 3 | C | 01-SEP-06 | Z | GH | GX | 01 | GH | 5D | GX | KE JB HD GT | N9GD | |
| S911 | DG | 3 | C | 01-SEP-06 | Z | XN | GX | 01 | XN | 5D | XN GX | S003 |
Service data
Army
- Matcat 1
- J
- Matcat 2
- 2
- Matcat 3
- 1
- Matcat 4 5
- 00
- ARC
- X
Navy
- COG
- 9B
Air Force
- Fund
- SF
- Budget
- 9
- MMAC
- SX
- PVC
- N
- ERRC
- P
Freight
- ACTY CD
- XX
- NMFC
- 062120
- NMFC sub
- Z
- Uniform freight class
- 34760
- Less than truckload
- W
- Water commodity code
- 593
- Type of cargo code
- Z
- Special handling code
- 9
- Air dimension code
- A
- Air commodity code
- HZ
- NMF description
- GENERATORS/MOTORS/PARTS NOI
Packaging
Unit and preservation
- PICA SICA
- P
- PKG cat
- 60C0
- Unpackaged weight
- 0.0000
- Unpackaged width
- 0.000
- Unpackaged length
- 0.000
- Unpackaged height
- 0.000
- TOS
- A
- Intermediate container qty
- 000No intermediate container quantity specified (000)
- Method of preservation
- 10Physical protection
- Clng drying
- 1Any suitable process that is not injurious to the item.
- Pres mat
- 00No requirement
- Wrap mat
- JAA-A-3174, plastic sheet, polyolefin, 2 mil
- Cush dun
- NAPPP-C-795, closed cell plastic cushioning; or A-A-3129, open cell plastic cushioning; or PPP-C-1797, polypropylene...
- THK
- C3/4 inch thick
- Unit cont
- D3PPP-B-566, PPP-B-676, or ASTM D5118/D5118M, folding, setup or fiberboard box.
- PKG data source
- P
Unit pack
- PICA SICA
- P
- SPC MKG
- 00No special marking
- Inter cont
- 00No requirement.
- Lvl A
- EPacking shall be accomplished to meet the performance test requirements of ASTM D4169, Distribution Cycle 18,...
- Lvl b
- QPacking shall be accomplished in accordance with table C-II for the packing level specified.
- Unit pack weight
- 10.0000
- UP SZ MAXB
- 0.00000
- UP SZ MAXL
- 0.00000
- UP SZ MAXH
- 0.00000
- Unit pack cube
- 0.4440
- OPI
- OOptions can be exercised as to specific method of preservation or DoD approved packaging materials to be used.
Packaging instructions
- PICA SICA
- P
- PKG design ACTY
- 13873
- SPI date
- 00000
Related items
Standardization
- Item standardization code
- C
- Orig stdzn dec
- CX
- Dt stdzn dec
- 23-NOV-1971
- NIIN status code
- 0
Request a quote
Your request goes to A-DEFENSE, a US Defense supplier in Texas, who will reply by email.